CRYOSPHERE & CLIMATE | ATMOSPHERIC CHEMISTRY & DYNAMICS  
ATMOSPHERE, OCEANS & CLIMATE | WATER, ENERGY & CLIMATE  
  
   

WCRP Climate-system Historical Forecast Project (CHFP)

 

Overview & News | Protocol | Participants | Data Archive | Projects | Publications | WGSIP

 

CHFP Participants

The table below lists the models currently listed as participating in CHFP, and shows the location(s) of the server(s) containing the data. In some cases the data is not yet available. Note that the web addresses refer to top level pages at the data server, which should contain full documentation of the model datasets as well as access to the data itself.

Modeling Group

Contact

 Model Version

Status

Server

Comments

ECMWF

-

IFS/HOPE Cy29r2

Done

ENSEMBLES data server

Ensembles stream 2

ECMWF

-

IFS/HOPE Cy31r1

-

-

Ensembles stream 2

Meteo France (France)

deque@meteo.fr

ARPEGE-OPA
TL63L31R

Done

ENSEMBLES data server

Ensembles stream 1

Met Office (UK)

albertoarribas@metoffice.gov.uk
adam.scaife@metoffice.gov.uk

GloSea4 N96

Done

ENSEMBLES data server

Ensembles stream 1

Met Office (UK)

adam.scaife@metoffice.gov.uk

DePreSys

Done

ENSEMBLES data server

Ensembles stream 1

IfM, Kiel (Germany)

-

ECHAM5/OM1

Done

ENSEMBLES data server

Ensembles stream 1

University of Miami/

RSMAS (USA)

bkirtman@rsmas.miami.edu

CCSM3.0 T85x1

Done

CIMA

Porting data to CIMA

NOAA NCEP (USA)

arun.kumar@noaa.gov

CFSv2
T126L64

Underway, target end of yr

TBD

-

NOAA GFDL (USA)

Rich.Gudgel@noaa.gov

-

-

-

-

BMRC (Australia)

O.Alves@bom.gov.au

-

-

-

-

JMA/MRI (Japan)

tomoaose@mri-jma.go.jp

JMA/MRI-CGCM3
TL95L40
(192x96x40)

Done

Plan to submit to APCC

Ready to submit data

CCCma (Canada)

bill.merryfield@ec.gc.ca
george.boer@ec.gc.ca

CanCM3 T63/L31
CanCM4 T63/L35
Ocean: 1.41x0.94L40

CanCM3 - done
CanCM4 - target end of Oct.

CCCma Server

12 month forecasts each month 1979-2008

CPTEC (Brazil)

pnobre@cptec.inpe.br

-

-

-

-

IRI/Columbia University (USA)

daved@iri.columbia.edu

ECHAM-MOM2
AGCM is T42L19
OGCM is 0.5°x1.5°

Done

IRI Server

Output from an anomaly coupled model and a 2-tier forecast system imminent

NASA/GSFC (USA)

siegfried.d.shubert@nasa.gov
michele.m.rienecker@nasa.gov
max.j.suarez@nasa.gov

GEOS-5
1o atmos, 0.5° ocean

Will start in Oct, plan to have at least Feb and Aug runs completed by Jan 31

NASA GMAO through OPeNDAP

-

Tel-Aviv University (Israel)

Pinhas@post.tau.ac.il

REgCM3 50x25km

Ongoing and some integrations finished

Tel-Aviv University

-

First Institute of Oceanography (FIO), SOA, China

qiaofl@fio.org.cn

(1) ATM: CAM3, T42L26;
(2) LND: CLM3, T42;
(3) OCN: POP1.4.3, 1.1° by 0.3~0.5°, 40 vertical layers;
(4) ICE: CSIM5, 1.1° by 0.3~0.5°;
(5) WAVE: MASNUM wave model, 2° by 2°

Will likely participate

TBD (but may be at the website of http://www.fio.org.cn)

Group has integrated climate model for more than 2000 years

MIROC (AORI/NIES/JAMSTEC) (Japan)

kimoto@aori.u-tokyo.ac.jp, maish@mri-jma.go.jp,
hiro@aori.u-tokyo.ac.jp

MIROC5 (T85L40 Atmos + 1.4°L50 Ocean)

To be done

Our local server + CIMA(?)

EC-Earth

wilco.hazeleger@knmi.nl

EC-Earth, T159L62 atmosphere, 1° ocean

Likely future participation

BADC

EC-Earth is a consortium, there is likely to be interest from some groups in the consortium, in particular Barcelona (Paco Doblas Reyes at IC3), to participate. However, currently, resources are all used for CMIP5

CMCC (Italy)

alessio.bellucci@cmcc.it silvio.gualdi@bo.ingv.it

CMCC-CM. Atmos:T159L31. Oce: 2°x2° L31 with latitudinal refinement (up to 0.5°) around the Equator

PCMDI

A set of 3-members ensembles of 30-yrs long hindcast/forecast simulations covering the 1960-2035 time period is currently under production (60% completed) within the framework of CMIP5 and COMBINE FP7 EU Project.

Beijing Climate Center(BCC), CMA, (China)

twwu@cma.gov.cn

Beijing Climate Center Climate System Model (BCC_CSM)

Likely future participation

-

-

 

Table note
The European-funded ENSEMBLES project defined two experimental protocols. The first, "Ensembles stream 1", is essentially a set of test integrations, covering the 11 years 1991-2001 and with May and November start dates only. The second, stream 2, is essentially equivalent to the CHFP protocol.

 

 

^
TO TOP

Last update: 02.12.2011 by Anna Pirani
Site powered by WMO and IPSL-WCRP Support Unit (France)